New Disposal Driveway in Münster, Germany
A new disposal driveway was now introduced at Münster’s sheetline! The innovation is the outcome of a project that started in August 2015 to enhance safety and time efficiency for shift work logisticians. With about 25,000 palettes per year, the sheetline has the highest palettes output of all production lines and, in addition, its disposal driveway used to be the longest and most dangerous one. With the help of a variety of WAM tools, the situation was visualized and new disposal driveways considered. As a result, the way in between both production halls (sheetline and tubeline 2/3) proofed to be the most ideal way. The reconstruction started in January and was now finalized.